首页> 外文期刊>Bulletin >Geothermal Latin America - 2003 Update
【24h】

Geothermal Latin America - 2003 Update

机译:拉丁美洲地热-2003更新

获取原文
获取原文并翻译 | 示例
           

摘要

The first Latin American country to develop its geothetmal resources for electricity generation was Mexico (Pathe, 1955-1958; Cerro Prieto, 1973; Los Azufres, 1982; Los Humeros, 1990; Tres Virgenes, 2001). That success was followed by El Salvador (Ahuachapan, 1975; Berlin, 1999), Nicaragua (Momotombo, 1983), Costa Rica (Miravalles, 1994), and Guatemala (Zunil and Amatitlan 1999). Though no other country in the region has produced geothermal electricity on a continuous basis, Argentina had a 670-kilowatt binary power plant online between 1988 and 1996 (F. Miranda, 2004).
机译:拉丁美洲第一个开发其地热资源用于发电的国家是墨西哥(Pathe,1955-1958; Cerro Prieto,1973; Los Azufres,1982; Los Humeros,1990; Tres Virgenes,2001)。紧随其后的是萨尔瓦多(Ahuachapan,1975;柏林,1999),尼加拉瓜(Momotombo,1983),哥斯达黎加(Miravalles,1994)和危地马拉(Zunil和Amatitlan,1999)。尽管该地区没有其他国家连续生产地热电力,但阿根廷在1988年至1996年间在线发电了670千瓦的二元发电厂(F. Miranda,2004年)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号