首页> 外文期刊>Bulletin >A Drilling Engineer's Explanation
【24h】

A Drilling Engineer's Explanation

机译:钻井工程师的解释

获取原文
获取原文并翻译 | 示例
       

摘要

Geothermal wells differ greatly from oil and gas wells. Due to temperature increases in the well bore, geothermal wells are cemented from the bottom of all casing strings back to the surface. Oil and gas wells are usually only cemented around the casing bottom leaving the upper zones uncemented. Therefore, in areas where geothermal well fracking is proposed-and, as Steve says, this is rare-the frack interval will be deep. It must take place in the portion of the well where a reservoir can exist at high temperatures because we want to inject water into the fractures to be heated in order to produce a commercial geothermal fluid.
机译:地热井与油气井有很大的不同。由于井筒中的温度升高,地热井从所有套管柱的底部固结回地面。油气井通常仅在套管底部周围固结,而上部区域不固结。因此,在提议进行地热井压裂的地区,而且正如史蒂夫所说,这种情况很少见,压裂间隔将很深。它必须发生在井中可以在高温下存在储层的部分中,因为我们想将水注入要加热的裂缝中,以生产商用地热流体。

著录项

  • 来源
    《Bulletin》 |2013年第1期|5-5|共1页
  • 作者

    Lou Capuano Jr.;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号