The cross city tunnel in Sydney has been a fairly spectacular failure as a Public Private Partnership (PPP). The operating company went into receivership less than 2 years after the tunnel opening in August 2005. The tunnel, built at a cost of about $800 million, failed to attract the traffic required to meet interest payments. Even when use of the tunnel was free, the traffic did not approach the forecast traffic levels of 90,000 vehicles per day. The paper argues that the project was always a marginal one - the volume of traffic that needs to move east-west across the city is relatively small. This fundamental problem was exacerbated by the high cost of the toll ($3.56), the lack of traffic growth in the east of Sydney and the negative reaction of consumers to what they saw as government attempts to force them to use the tunnel. Whilst a major difference of this project when compared to earlier PPPs is that the private partners bore most of the risk, the actions of the government in breaking the terms of the original contract will expose them to higher risks and financing costs in the future. The issue for the private infrastructure sector is that the public views the project as a dismal failure and hence their appetite for future PPPs may be diminished.
机译:作为公私合作伙伴关系(PPP),悉尼的跨城市隧道是一个相当壮观的失败。该运营公司于2005年8月隧道开通后不到2年就进入了接管程序。该隧道耗资约8亿美元建造,未能吸引到支付利息所需的交通。即使免费使用隧道,交通量也无法达到每天90,000辆的预测交通量。该论文认为,该项目总是一个边际项目-需要东西向穿越整个城市的交通量相对较小。通行费的高昂费用(3.56澳元),悉尼东部交通缺乏增长以及消费者对政府试图强迫他们使用隧道的看法产生了消极反应,加剧了这一基本问题。与早期的PPPs相比,该项目的主要区别在于私人合伙人承担了大部分风险,但政府在违反原始合同条款方面的行为将使他们在未来面临更高的风险和融资成本。私营基础设施部门的问题是,公众认为该项目是一个惨痛的失败,因此他们对未来PPP的需求可能会减弱。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号