首页> 外文期刊>Building >What Was To Have Been Spent When
【24h】

What Was To Have Been Spent When

机译:什么时候花了什么

获取原文
获取原文并翻译 | 示例
           

摘要

1.£45bn Building Schools for the Future (BSF) programme, which equates to about £2.5bn per financial year.rn2. £7bn primary capital programme will equate to £1.75bn spending in 2009-11. The accelerated spendingrn3.£800m brought forward, largely for primary capital programme and local authority funds for improvements to secondary school buildingsrn4.£442m to accelerate support for about 25 further education college building schemes and 50 higher education building projects.rnThe realityrn5.For the further education programme, new schemes have been frozen until March, although sources say some projects may be on hold for a year. The LSC, the body responsible for the £5bn building programme, confirmed in January that it had been forced to place large parts of the programme on hold. The reason given was arnlack of immediately available finance, even though thernpre-Budget said it would receive accelerated spending.
机译:1450亿英镑建设未来的学校计划(BSF),相当于每个财政年度25亿英镑。 70亿英镑的基本资本计划将相当于2009-11年度的17.5亿英镑支出。提出了加速支出3.8亿英镑,主要用于改善基本建筑的初级资本计划和地方政府资金。4.42亿英镑用于加速支持约25个继续教育学院的建设计划和50个高等教育建设项目。继续教育计划方面,新计划已冻结至3月,尽管消息人士称某些项目可能会搁置一年。 LSC是负责50亿英镑建筑计划的机构,于1月份确认,它被迫搁置了该计划的大部分内容。给出的理由是,尽管预备预算表示它将获得加速的支出,但仍缺乏立即可用的资金。

著录项

  • 来源
    《Building》 |2009年第8568期|30-32|共3页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号