首页> 外文期刊>Building >Oda Backs Down Over Media Centre
【24h】

Oda Backs Down Over Media Centre

机译:小田大夫在媒体中心退缩

获取原文
获取原文并翻译 | 示例
           

摘要

The Olympic Delivery Authority has backed down over plans to make the 2012 media centre a wholly temporary venue, under pressure from MPs and the London Development Agency.rnIn November, Building revealed that the ODA was considering making the £385m centre, originally planned to become a centre for hi-tech media employing 9,000 people, a temporary venue with a life of under two years.rnSources close to the process now say the ODA has backed down from the move, despite pressure to cut construction costs. However, the original scheme, by regeneration developer Igloo and Carillion, has not been reinstated. Instead, a new scheme is being worked up at a lower specification.
机译:在国会议员和伦敦发展局的压力下,奥林匹克交付管理局已取消了将2012年媒体中心变成一个完全临时场地的计划。11月,Building透露,官方发展援助正在考虑将这笔3.85亿英镑的中心原计划成为一个拥有9000名员工的高科技媒体中心,一个临时的场地,寿命不到两年。接近消息来源的消息人士现在表示,尽管削减建筑成本的压力很大,但官方发展援助已经撤退了。但是,由再生开发商Igloo和Carillion制定的原始计划尚未恢复。取而代之的是,正在以较低的规格制定新的方案。

著录项

  • 来源
    《Building》 |2009年第1期|10|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号