首页> 外文期刊>Building >YOUR STARTER FOR TEN
【24h】

YOUR STARTER FOR TEN

机译:您的初学者十

获取原文
获取原文并翻译 | 示例
           

摘要

Ever since the brakes were applied to the schools construction juggernaut that was Building Schools for the Future, construction firms have been pondering how to fill the gap it has left behind. It is easy to see why there is concern. The output of education buildings, including schools, colleges and universities built with both public and private cash held steady in 2011, dropping just under half a percentage point from the year before as spending cuts took time to hit. But in its summer forecast the Construction Products Association (CPA) predicted that falls of 15%, 12% and 2% were to come in 2012, 2013 and 2014 respectively.
机译:自从将制动器应用于“未来学校建设”的学校建设巨头以来,建筑公司就一直在思考如何填补它留下的空白。很容易看出为什么会有担忧。 2011年,包括使用公共和私人现金建造的学校,学院和大学在内的教育建筑的产量保持稳定,由于削减开支需要时间,因此与上一年相比下降了近0.5个百分点。但建筑产品协会(CPA)在其夏季预测中预测,到2012年,2013年和2014年分别下降15%,12%和2%。

著录项

  • 来源
    《Building》 |2012年第36期|p.30-33|共4页
  • 作者

    CHLOE STOTHART;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号