首页> 外文期刊>Building >HANSOM INTERRUPTED SERVICE
【24h】

HANSOM INTERRUPTED SERVICE

机译:HANSOM中断服务

获取原文
获取原文并翻译 | 示例
           

摘要

There were red faces at Bam Nuttall last week, I'm sure, after it emerged that concrete being poured by the contractor as part of the construction of the new Victoria station had leaked into a signal control room for the tube line, flooding the floor. The incident, photos of which were plastered across the internet, led to the suspension of services on the Victoria line. London Underground engineers worked through the night to clear away the concrete and repair the signalling systems in time for the morning commute. The Victoria station project is an exemplar BIM scheme, which just goes to show that there are some risks that even a fully collaborative model can't design out.
机译:我敢肯定,上周在班纳塔尔(Bam Nuttall)出现了红脸,这是因为承包商在新维多利亚车站建设过程中浇筑的混凝土泄漏到了管道的信号控制室,淹没了地板。该事件的照片在互联网上被粘贴,导致维多利亚线上的服务暂停。伦敦地铁的工程师通宵工作,以清理混凝土并及时维修信号系统,以便于通勤。维多利亚车站项目是一个示例性的BIM方案,它只是表明存在某些风险,即使是完全协作的模型也无法设计出这种风险。

著录项

  • 来源
    《Building》 |2014年第4期|19-19|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号