首页> 外文期刊>Building >Schools consortium loses £1.5m in fees over repairs saga
【24h】

Schools consortium loses £1.5m in fees over repairs saga

机译:学校财团因维修传奇损失了150万英镑的费用

获取原文
获取原文并翻译 | 示例
           

摘要

The consortium behind the Edinburgh PFI schools saga has had £1.5m in monthly fees withheld while the schools are being repaired, it has emerged. It also emerged that there is no timetable for repairs to the 17 schools, damaged by storms in January, as the structural surveys are still ongoing. Amey and Miller Construction, which was bought by Galliford Try in 2014, will carry out the remedial works once the surveys are complete.
机译:爱丁堡PFI学校传奇背后的财团已经隐瞒了150万英镑的月度费用,而这些学校正在维修中。还发现,由于结构调查仍在进行中,因此没有维修时间表,无法修复一月份受风暴破坏的17所学校。调查完成后,2014年被Galliford Try收购的Amey and Miller Construction将进行补救工作。

著录项

  • 来源
    《Building》 |2016年第16期|11-11|共1页
  • 作者

    Yoosof Farah;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号