首页> 外文期刊>Building >COST COMPARISON UPDATES
【24h】

COST COMPARISON UPDATES

机译:成本比较更新

获取原文
获取原文并翻译 | 示例
           

摘要

These five projects were originally part of the Target Zero study conducted by a consortium of organisations including Tata Steel, Aecom, SCI, Cyril Sweett and the BCSA in 2010 to provide guidance on the design and construction of sustainable, low- and zero-carbon buildings in the UK. The cost models for these five projects have been reviewed and updated as part of the Costing Steelwork series. The latest cost models as of Q2 2019 are presented here. Below is an update to the offices cost comparison originally published in the Costing Steelwork Offices feature in Building magazine in April 2017.
机译:这五个项目最初是由2010年包括塔塔钢,AECOM,SCI,Cyril Sweett(包括塔塔钢铁,AECOM,SCI,Cyril Sweett和BCSA)的组织进行的零点研究的一部分。为可持续,低碳建筑物的设计和建设提供指导在英国。这五个项目的成本模型已被审查和更新为代价钢结构系列的一部分。此处介绍了截至2019年第2季度的最新成本模型。以下是2017年4月在建筑杂志中展出的办事处成本比较的更新。

著录项

  • 来源
    《Building》 |2019年第28期|50-51|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号