首页> 外文期刊>Building >Highways England ignores MPs' Stonehenge fears
【24h】

Highways England ignores MPs' Stonehenge fears

机译:英格兰高速公路忽略了MPS的巨石阵的恐惧

获取原文
获取原文并翻译 | 示例
           

摘要

Highways England has kicked off the search for a main contractor to build the £1.7bn Stonehenge road tunnel, despite watchdog MPs' concerns about the viability of the scheme, writes Jordan Marshall. On a contract notice for the main contractor job, which was published this week, Highways England has said the contract will be worth £1.25bn to the winning team. The government's roads agency is looking to draw up a shortlist of three firms or joint ventures to carry out the job, which it says will run for up to 13 years given the contract will include up to seven years of maintenance work. The successful bidder will also be responsible for the design and construction of the new infrastructure, the refurbishment, replacement and modification of existing assets and maintenanceand operation during construction.
机译:高速公路英格兰已启动搜索主要承包商,尽管看门狗国会议员对该计划的可行性的担忧,但仍然是对该计划的可行性的担忧来建立1.7亿英镑的巨石阵路隧道。在本周发表的主要承包商工作的合同通知中,英格兰高速公路表示,该合同将为获胜团队价值1.25亿英镑。政府的道路代理正在寻求制定三家公司或合资企业的候选名单,以执行这项工作,它表示将在鉴于合同将包括多达七年的维护工作,这将持续到13年。竞标者也将负责新基础设施的设计和建设,现有资产和维护的翻新,更换和修改和施工期间的操作。

著录项

  • 来源
    《Building》 |2019年第28期|14-14|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号