首页> 外文期刊>Building >THE GOOD, THE BAD AND THE ELUSIVE
【24h】

THE GOOD, THE BAD AND THE ELUSIVE

机译:好的,坏和难以捉摸

获取原文
获取原文并翻译 | 示例
           

摘要

The case of Willow Corp Sarl vs MTD Contractors Ltd is one of the first to apply the principles on how to spot when practical completion has been achieved that were outlined in the recent Court of Appeal case of Mears Ltd vs Costplan Services (South East) Ltd. Lindy Patterson wrote about this case in her Building article in May (10 May, page 40). The court in Willow rightly referred to practical completion as an "elusive concept". It certainly turned out that way in this case. MTD had entered into a contract with Willow to design and build a Nobu hotel in Shoreditch. The intended completion date was 3 February 2017 but the project slipped into delay. The February date came and went, and this led to the parties discussing a phased handover of the hotel. At the same time MTD had raised claims for loss and expense and other cost overruns.
机译:Willow Corp Sarl VS MTD Contractors Ltd是第一个在最近的概念概述的MEARS LTD案件上概述的实际完成时应用了如何现货的原则之一。 。Lindy Patterson在5月(5月10日)的建筑物中写了关于这种情况的案子。杨柳的法院正确地提到了实际完成作为“难以捉摸的概念”。在这种情况下,它肯定是这样。 MTD与柳树签订了合同,设计并在肖林特建造了诺鲁酒店。预期的完成日期是2017年2月3日,但该项目陷入延迟。 2月的日期来了,这导致了各方讨论了酒店的逐步切换。同时,MTD提出了损失和费用的索赔和其他成本超支。

著录项

  • 来源
    《Building》 |2019年第28期|44-45|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号