首页> 外文期刊>Building >Council in bid to 'improve relations' at delayed Interserve site in Soho
【24h】

Council in bid to 'improve relations' at delayed Interserve site in Soho

机译:议会在SOHO延迟延迟的延迟体内议会中投标“改善关系”

获取原文
获取原文并翻译 | 示例
           

摘要

Westminster council says it has posted staff to maintain relations between builders and locals as anger grows over delays to a major mixed-use scheme Interserve is building in Soho. A 110-bed Premier Inn, due to open last autumn, is one part of a redevelopment being built by the firm and which has been delayed by water ingress and problems with structural steel works. Residents told Building they are getting fed up with the "endless delays" on the scheme, while traders on Berwick Street market are angry about the noise and dust produced by construction work. Westminster council, which owns the freehold on the site, has stepped into the row, saying it is "extremely frustrated" by the delays, telling Building it "understand[s| the difficulties this work has caused for local residents and businesses".
机译:威斯敏斯特委员会表示,它已经发布了员工,以维持建设者和当地人之间的关系,因为愤怒随着延误而延误,主要的混合用途计划中的苏霍尔正在建设。今年秋季开放为110张床普瑞米尔Inn是由公司建造的重建的一部分,其中已被水入延迟和结构钢厂的问题延迟。居民告诉大楼,他们正在厌倦了该计划的“无尽的延误”,而伯威克街市的贸易商对建筑工作产生的噪音和灰尘造成了愤怒。威斯敏斯特委员会拥有本网站上的永久业权,已经进入了行,说延误是“极度沮丧”,告诉建设它“明白这项工作为当地居民和企业造成的困难”。

著录项

  • 来源
    《Building》 |2019年第27期|15-15|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号