首页> 外文期刊>Building >Costain set for £150m Gatwick airport station improvement
【24h】

Costain set for £150m Gatwick airport station improvement

机译:成本为150万英镑盖特威克机场站改善

获取原文
获取原文并翻译 | 示例
           

摘要

Costain is set to carry out the £150m upgrade of the railway station servicing London's second-largest airport. The Department for Transport (DfT) has promised £150m of funding for the Gatwick airport project that will see the station concourse double in size and two platforms widened. The scheme will also add five lifts and eight escalators. Work is expected to begin in early 2020 and be completed during 2022. The renovation will be managed by Network Rail, in partnership with the DfT. Gatwick Airport Ltd and Coast to Capital Local Enterprise Partnership are co-funding the project, contributing another £37m and £10m respectively.
机译:COSTAIN设定为开展伦敦第二大机场的火车站150米升级。运输部(DFT)向盖特威克机场项目承诺150万英镑的资金,这些项目将看到大小的站点加倍,两台平台扩大。该方案还将增加五个升降机和八个自动扶梯。工作预计将于2020年初开始,并在2022年期间完成。通过网络铁路,与DFT合作,改造将由网络轨道管理。 Gatwick Airport Ltd和Coast To Capital Locial Enterprise Partnership正在共同资助该项目,分别为额外3700万英镑和1000万英镑的贡献。

著录项

  • 来源
    《Building》 |2019年第27期|10-10|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号