首页> 外文期刊>Building >Firms make plans for sickness and supplies
【24h】

Firms make plans for sickness and supplies

机译:企业制定疾病和物资计划

获取原文
获取原文并翻译 | 示例
           

摘要

Construction firms have begun putting contingency plans in place as the number of cases of coronavirus in the UK continues to rise. More than 300 cases have been reported in the UK and this week England's chief medical officer, professor Chris Whitty, said that anyone with a cold, flu or a fever is likely to soon be asked to stay at home in self-isolation. A spokesperson for Sisk, building a 42-storey residential tower in Birmingham for developer Moda Living, said: "We have restricted non-essential travel for staff, raised awareness about hand hygiene, provided hand sanitising gels and introduced practical proactive measures such as increased cleaning frequencies in our offices and site facilities."
机译:随着英国冠状病毒病例数持续增加,建筑公司已开始制定应急计划。英国已报告了300多例病例。本周,英国首席医学官克里斯·惠蒂(Chris Whitty)教授说,感冒,流感或发烧的任何人都可能很快被要求留在家中进行自我隔离。 Sisk的发言人在伯明翰为开发商Moda Living建造了一座42层高的住宅塔楼。他说:“我们限制了员工的不必要旅行,提高了对手部卫生的认识,提供了手部清洁凝胶,并采取了诸如我们办公室和现场设施的清洁频率。”

著录项

  • 来源
    《Building》 |2020年第10期|8-9|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号