首页> 外文期刊>Building >Measures to curb virus not feasible for much of sector
【24h】

Measures to curb virus not feasible for much of sector

机译:遏制病毒的措施在许多部门都不可行

获取原文
获取原文并翻译 | 示例
           

摘要

The construction industry is bracing itself for the impact of coronavirus after a government warning that up to 20% of the country's workforce could be sidelined by the epidemic. Ministers admit it is possible that up to that amount could be unable to work during peak weeks. There are fears that staffing shortages could bring the sector to a halt just after it experienced its first period of growth in nearly a year. According to the latest CIPS/IHS Markit PMI, construction activity increased for the the first time since April 2019 and at the fastest pace since December 2018.
机译:在政府警告该国多达20%的劳动力可能被这一流行病淘汰之后,建筑行业正在为应对冠状病毒的影响做好准备。部长们承认,有可能在高峰期无法工作到这个数量。有人担心,人员短缺可能会使该行业在经历了将近一年的首次增长后就停顿下来。根据最新的CIPS / IHS Markit PMI,建筑活动自2019年4月以来首次增加,是自2018年12月以来最快的速度。

著录项

  • 来源
    《Building》 |2020年第9期|8-9|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号