首页> 外文期刊>Building >COST COMPARISON UPDATES
【24h】

COST COMPARISON UPDATES

机译:费用比较更新

获取原文
获取原文并翻译 | 示例
           

摘要

These five projects were originally part of the Target Zero study conducted by a consortium of organisations including Tata Steel, Aecom, SCI, Cyril Sweett and the BCSA in 2010 to provide guidance on the design and construction of sustainable, low- and zero-carbon buildings in the UK. The cost models for these five projects have been reviewed and updated as part of the Costing Steelwork series. The latest cost models as of Q2 2019 are presented here. Below is an update to the offices cost comparison originally published in the Costing Steelwork Offices feature in Building magazine in April 2017.
机译:这五个项目最初是由塔塔钢铁,Aecom,SCI,西里尔·斯威特和BCSA等组织组成的财团于2010年进行的“零目标”研究的一部分,旨在为可持续发展的低碳和零碳建筑的设计和建造提供指导在英国。这五个项目的成本模型已作为Costing Steelwork系列的一部分进行了审查和更新。此处显示了截至2019年第二季度的最新成本模型。以下是对办公室成本比较的更新,该比较最初于2017年4月在《建筑》杂志的《成本核算钢结构办公室》功能中发布。

著录项

  • 来源
    《Building》 |2019年第28期|50-51|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号