首页> 外文期刊>Building >PROCUREMENT'S PROGRESS
【24h】

PROCUREMENT'S PROGRESS

机译:采购进度

获取原文
获取原文并翻译 | 示例
           

摘要

By chance on Christmas Eve I bumped into Noel Foley, an architect and pioneer of collaborative construction procurement, now retired to Sligo in Ireland to study calligraphy and Islamic art. In 1999 Noel led the adoption by the London borough of Hackney of the first ever PPC2000 project alliance contract. We discussed how, 20 years on, there is a wealth of evidence showing the positive impact of good procurement and contracting practices. We also reflected on recent terrible reminders of what can go wrong if real cost and quality issues are not examined and agreed ahead of start on site, and if supply chain members and occupiers are not fully involved.
机译:偶然在圣诞节前夕,我碰到了诺埃尔·弗利(Noel Foley),他是协作建筑采购的建筑师和先驱,现在退休到爱尔兰的斯莱戈学习书法和伊斯兰艺术。 1999年,诺埃尔(Noel)带领伦敦市哈克尼区(Hackney)通过了第一份PPC2000项目联盟合同。我们讨论了20年后如何有大量证据显示良好的采购和签约做法的积极影响。我们还回顾了最近的可怕提醒:如果在开始现场之前未检查并同意实际成本和质量问题,并且供应链成员和占用者未充分参与,会出什么问题。

著录项

  • 来源
    《Building》 |2019年第2期|41-41|共1页
  • 作者

    David Mosey;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号