首页> 外文期刊>Building >COMPLICATIONS WITH TERMINATION
【24h】

COMPLICATIONS WITH TERMINATION

机译:终止的复杂化

获取原文
获取原文并翻译 | 示例
           

摘要

When Dame Zaha Hadid's Tokyo Olympic stadium project was cancelled or terminated in 2015, she moved on elegantly. "It is not the case that the recently reported cost increases are due to the design, which uses standard materials and techniques well within the capability of Japanese contractors and meets the budget set by the Japan Sports Council," she said, adding: "The real challenge for the stadium has been agreeing an acceptable construction cost against the backdrop of steep annual increases in construction costs in Tokyo and a fixed deadline."
机译:扎哈·哈迪德夫人(Dame Zaha Hadid)的东京奥林匹克体育场项目在2015年被取消或终止时,她优雅地前进。她说:“最近发生的成本增加并不是由于设计导致的,设计完全在日本承包商的能力范围内使用了标准的材料和技术,并且符合日本体育理事会设定的预算,”她补充说: “在东京每年的建筑成本急剧上升且有固定期限的背景下,体育场的真正挑战是要商定可接受的建筑成本。”

著录项

  • 来源
    《Building》 |2018年第11期|42-43|共2页
  • 作者

    Hamish Lal;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号