TERMINAL REBIRTH

机译:端子重生

获取原文
获取原文并翻译 | 示例
           

摘要

The 9/11 terrorist attacks had an immediate impact on Kansas City International Airport's $258 million terminal improvement program, which was just about to get off the ground as the horrifying events in New York City, rural Pennsylvania, and Washington, D.C., unfolded. Walton Construction Co., the last member selected for the KCI Building Team, received a notice to proceed with construction on August 6, 2001, barely a month before the terrorist attacks. "9/11 required a lot of rethinking, not just on our part, but by the Kansas City Aviation Department, the designers and the program manager," says Walton project manager Lee Turner. They considered shelving the project for a year, but ultimately the work was resumed after a six-day delay.
机译:9/11恐怖袭击对堪萨斯城国际机场2.58亿美元的航站楼改善计划产生了直接影响,随着纽约市,宾夕法尼亚州农村和华盛顿特区的恐怖事件的展开,该计划即将起步。沃尔顿建筑公司(Kalton Building Co.)是KCI建筑团队的最后一名成员,该公司接到通知,要在2001年8月6日,即恐怖袭击发生前一个月开始进行建筑。沃尔顿项目经理李·特纳(Lee Turner)说:“ 9/11不仅需要我们重新考虑,而且还需要堪萨斯城航空局,设计师和项目经理进行大量重新思考。”他们考虑将项目搁置一年,但是最终工作在推迟了六天后才恢复。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号