...
首页> 外文期刊>Bridge design & engineering >Storebcelt prepares for delicate shuttle shuffle
【24h】

Storebcelt prepares for delicate shuttle shuffle

机译:Storebcelt为精致的穿梭洗牌做准备

获取原文
获取原文并翻译 | 示例
           

摘要

Three new access trains are due to be installed inside the decks of Denmark's Storebaelt East Bridge before the end of this year, replacing the original systems that are now more than 20 years old. But the new equipment has had to be designed so that it can be taken to pieces in order to get it through the small access shafts into the box girder decks. The original trains were placed inside the deck units before they were erected. Bridge operator Storebaelt has ordered three new shuttles and three new carriages for the bridge, which are being designed and manufactured by Fata Automation in the UK.
机译:到今年年底之前,将在丹麦的Storebaelt东桥的桥面甲板内安装三列新的检修列车,以取代已有20多年历史的原始系统。但是必须对新设备进行设计,以便可以将其拆成小块,以使其通过小的检修轴进入箱形梁甲板。原始火车在架设之前被放置在甲板单元内。桥梁运营商Storebaelt已订购了三辆新的梭车和三辆新的车厢,由英国Fata Automation设计和制造。

著录项

  • 来源
    《Bridge design & engineering》 |2017年第89期|8-8|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号