Simulation-based safety evaluation model integrated with network schedule

机译:结合网络调度的基于仿真的安全评估模型

获取原文
获取原文并翻译 | 示例
           

摘要

Construction accidents often lead to project delays. However, in practice, construction safety and schedule control are managed separately. This work develops an innovative simulation-based model, SimSAFE, that assesses the hazard (or expected accident costs) for each activity in a network schedule. Thus, at any time point, safety managers can pay considerable attention to activities (or paths or working zones) with high expected accident costs. Additionally, by breaking down the uncertainty of an accident cause occurring, SimSAFE provides factorsensitivity information to support safety risk management. Enhancing knowledge of the safety factors (such as safety training and site environment) to which an activity (or path or zone) is sensitive, and also of the activities (or paths or zones) that are most sensitive to a particular factor can provide management with a better sense of what factors and activities (or paths or zones) need to be controlled for reducing construction accidents, especially for a large project or multiple projects.
机译:施工事故经常导致项目延误。但是,实际上,施工安全和进度控制是分开管理的。这项工作开发了一个创新的基于仿真的模型SimSAFE,该模型可以评估网络计划中每个活动的危害(或预期的事故成本)。因此,在任何时间点,安全管理人员都可以对预期事故成本较高的活动(或路径或工作区域)给予相当大的关注。此外,通过打破事故原因不确定性,SimSAFE提供了因素敏感性信息以支持安全风险管理。增强对活动(或路径或区域)敏感的安全因素(例如安全培训和现场环境)以及对特定因素最敏感的活动(或路径或区域)的知识可以提供管理更好地了解需要控制哪些因素和活动(或路径或区域)以减少施工事故,特别是对于大型项目或多个项目。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号