...
首页> 外文期刊>Automation in construction >BIM- and 4D-based integrated solution of analysis and management for conflicts and structural safety problems during construction: 2. Development and site trials
【24h】

BIM- and 4D-based integrated solution of analysis and management for conflicts and structural safety problems during construction: 2. Development and site trials

机译:基于BIM和4D的分析和管理过程中的冲突和结构安全问题的集成解决方案:2.开发和现场试验

获取原文
获取原文并翻译 | 示例
           

摘要

In order to achieve the information-based integrated construction management, e.g., time-dependent structures analysis, schedule/resource/cost conflict analysis as well as dynamic collision detection amongst site facilities and main structure elements, an integrated archetypal system named 4D-GCPSU 2009 is developed. Through 3 project examples, it is verified that the integrated solution is able to assist construction managers or owners in the aspects of analysis and management for process conflict and structural safety problems during construction. The application outcome of the system is accepted and praised by users as they considered that the system functions and analysis results provide significant reference support to the approval and revision of construction proposals, increase efficiency and safety concerning building construction. They also point out some difficulties in practice. As for those difficulties mentioned, a series of solutions plus further development orientation are put forth.
机译:为了实现基于信息的集成施工管理,例如时变结构分析,进度/资源/成本冲突分析以及站点设施和主要结构元素之间的动态碰撞检测,一个名为4D-GCPSU 2009的集成原型系统被开发。通过3个项目示例,验证了该集成解决方案能够在施工过程中的过程冲突和结构安全问题的分析和管理方面,协助建筑经理或业主。该系统的应用成果受到用户的认可和好评,因为他们认为系统功能和分析结果为批准施工方案和修订施工方案提供了重要的参考依据,提高了建筑施工的效率和安全性。他们还指出了实践中的一些困难。针对上述困难,提出了一系列解决方案以及进一步的发展方向。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号