...
首页> 外文期刊>Automation in construction >Construction network-based interface management system
【24h】

Construction network-based interface management system

机译:基于施工网络的界面管理系统

获取原文
获取原文并翻译 | 示例
           

摘要

Many interface events and problems occur during the construction phase in construction projects. Interface management (IM) has become the most important project management strategy in construction management. Interface or changed events can be identified and traced in IM such that participants can improve construction processes, minimize rework, and reduce total duration. Information about systematic approaches for managing interface events and problems during the construction phase is lacking. This study proposes a new and practical methodology to track and manage interface events by using Network-based Interface Maps (NBIM). Using NBIM, users can get an overview of previous and current interface events in a selected project and take appropriate advanced control and manage interfaces. This study proposes and develops a web Construction Network-based Interface Management (CNIM) system for interface information sharing and tracking efficiency. The CNIM system is applied in a selected case study of a building project in Taiwan to verify our proposed methodology and demonstrate the effectiveness of interface management. With the evaluation of the case study, the results show that a CNIM system is effective in managing interfaces for building projects.
机译:在建设项目的建设阶段,会发生许多接口事件和问题。界面管理(IM)已成为建筑管理中最重要的项目管理策略。可以在IM中识别并跟踪界面或更改的事件,以便参与者可以改善施工过程,最大程度地减少返工并减少总工时。缺少有关在构建阶段管理界面事件和问题的系统方法的信息。这项研究提出了一种新的实用方法,通过使用基于网络的接口图(NBIM)来跟踪和管理接口事件。使用NBIM,用户可以概览选定项目中以前和当前的界面事件,并进行适当的高级控制和管理界面。这项研究提出并开发了一个基于Web建设网络的接口管理(CNIM)系统,用于接口信息共享和跟踪效率。 CNIM系统被用于台湾某建筑项目的选定案例研究中,以验证我们提出的方法并证明界面管理的有效性。通过对案例研究的评估,结果表明CNIM系统可以有效地管理建筑项目的界面。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号