Formal representation of cost and duration estimates for hard rock tunnel excavation

机译:硬岩隧道开挖成本和工期估算的形式化表示

获取原文
获取原文并翻译 | 示例
           

摘要

Due to the inherent uncertainties of rock mass properties, construction planners of hard rock tunnels have difficulty achieving on-time completion within budget. Despite the potential benefits of adapting stochastic programming and feedback control approaches for decision-making for excavation schedules, the lack of formal representations of the planners' rationales required to estimate the costs and durations of excavation schedules makes the implementation of these approaches extremely challenging. To address these limitations, the authors developed an ontology that represents the estimation rationales (e.g., transition costs and durations among excavation methods, multiple sets of rock mass properties, and schedule adjustment policies). This ontology enables planners to explicitly describe more the comprehensive information required to consistently estimate the costs and durations of excavation schedules for both preconstruction and construction compared to the current practices and the existing studies. Further research that accounts for learning effects resulting from transitions among excavation methods would make cost and duration estimations for excavation schedules more realistic.
机译:由于岩体性质的内在不确定性,硬岩隧道的施工计划人员难以在预算内按时完工。尽管采用随机规划和反馈控制方法来进行挖掘计划的决策具有潜在的好处,但是由于缺乏计划者估算挖掘计划的成本和工期所需的基本原理的正式表述,使得这些方法的实施极具挑战性。为了解决这些局限性,作者开发了一种表示估计原理的本体(例如,开挖方法之间的过渡成本和工期,多套岩体属性和时间表调整政策)。与当前的实践和现有的研究相比,这种本体使计划人员可以明确地描述更多的信息,以一致地估计施工前和施工中的挖掘计划的成本和工期。进一步的研究考虑到挖掘方法之间的转换所带来的学习效果,将使挖掘计划的成本和工期估算更加切合实际。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号