...
首页> 外文期刊>Architectural science review >Stochastic Productivity Assessment of Continuous Flight Auger Piles
【24h】

Stochastic Productivity Assessment of Continuous Flight Auger Piles

机译:连续螺旋钻桩的随机生产率评估

获取原文
获取原文并翻译 | 示例
           

摘要

Continuous flight auger (CFA) piles are widely used in the US and the UK as well as in many other countries. This paper focuses on developing simulation models to provide productivity and cost for various pile sizes and depths. Two simulation models were developed. Based on these models, various charts were developed to assess productivity and cost of the CFA process. Results showed that productivity is approximately 14, 24 and 93 piles (holes)/day for 0.36 m diameter piles at 21.34 m, 12.19 m, and 3.05 m depths, respectively. In addition, a pile of 0.36 m diameter and 12.19 m depth costs approximately US$790.00; however, it costs approximately US$ 1200/pile for 21.34 m depth. For the same pile size, the cost per unit volume is approximately US$620.00/m~3. The developed tools play an essential role in the CFA decision-making process. The results of simulation models are validated with an average validation factor (VF) of 1.01. This paper provides charts for practitioners' usage to schedule and price CFA pile construction projects. In addition, it provides researchers with a methodology for applying simulation to the CFA pile construction process and its limitations.
机译:连续飞行螺旋钻(CFA)桩在美国和英国以及许多其他国家被广泛使用。本文着重于开发仿真模型,以提供各种桩尺寸和深度的生产率和成本。开发了两个仿真模型。基于这些模型,开发了各种图表来评估CFA流程的生产率和成本。结果表明,对于深度为21.34 m,12.19 m和3.05 m的0.36 m直径桩,生产率分别约为14、24和93桩/天。此外,直径为0.36 m,深度为12.19 m的桩的成本约为790.00美元;但是,深度为21.34 m时,每桩成本约为1200美元。对于相同的桩号,每单位体积的成本约为620.00美元/ m〜3。所开发的工具在CFA决策过程中起着至关重要的作用。仿真模型的结果以1.01的平均验证因子(VF)进行验证。本文提供了图表,供从业者用来计划和定价CFA桩建设项目。此外,它为研究人员提供了一种将模拟应用于CFA桩施工过程及其局限性的方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号