...
【24h】

2016 job roundup

机译:2016年工作总结

获取原文
获取原文并翻译 | 示例
           

摘要

The 2016 SC&RA Job of the Year contest featured 21 entries by 13 companies. Projects entered were located in Canada, Mexico, Brazil, Guatemala, Italy, India and Africa as well as throughout the United States. There were 13 entries in the three Specialized Transport/Moving categories and eight entries in the four rigging categories. Emmert International removed an old transformer, off-loaded a new transformer from a rail car and transported it to a power plant in San Antonio, TX. Fully dressed for installation, the new transformer weighed 545,920 pounds and had an overall length of 43 feet 9 inches, a width of 21 feet 9 inches and a height of 26 feet 10 inches. Emmert used two customized transporters; each one performing at different stages. One transporter was used to offload the transformer and transport the load to the plant, and another, to maneuver the tight turning radius of the confined work space of the power plant. Equipment used included a Goldhofer 14 line PSTe and 12 line PSTe, a jack and slide system and a jack lowering and raising system.
机译:2016年SC&RA年度最佳工作竞赛有13家公司的21项参赛作品。进入的项目分别位于加拿大,墨西哥,巴西,危地马拉,意大利,印度和非洲以及整个美国。在三个“专业运输/移动”类别中有13个条目,在四个索具类别中有8个条目。埃默特国际公司(Emmert International)拆除了旧变压器,从轨道车上卸下了新变压器,然后将其运输到德克萨斯州圣安东尼奥市的发电厂。全新的变压器经过充分的安装准备,重545,920磅,总长度为43英尺9英寸,宽度为21英尺9英寸,高度为26英尺10英寸。埃默特使用了两个定制的运输工具。每个人在不同的阶段表演。一个运输机用于卸载变压器并将负载运输到电厂,另一个运输机用于操纵电厂受限工作空间的狭窄转弯半径。使用的设备包括Goldhofer 14线PSTe和12线PSTe,千斤顶和滑动系统以及千斤顶下降和升高系统。

著录项

  • 来源
    《American cranes & transport》 |2016年第5期|58-59|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号