首页> 美国卫生研究院文献>International Journal of Environmental Research and Public Health >Performance and Obstacle Tracking to Natural Forest Resource Protection Project: A Rangers’ Case of Qilian Mountain China
【2h】

Performance and Obstacle Tracking to Natural Forest Resource Protection Project: A Rangers’ Case of Qilian Mountain China

机译:天然森林资源保护项目的性能与障碍跟踪:祁连山的别人案例

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

Forests play an important role in the process of land degradation and restoration. As a national key ecological project for protecting natural forest, the natural forest resource protection project was implemented in 17 provinces for nearly 20 years. As the core stakeholders and main force for protecting forest resources, rangers have a clear, more objective and comprehensive perception of the policy process, problems and forest ecological changes than farmers. This study introduces public value theory, builds a performance evaluation system that combines the “process-outcome” of ecological construction and uses the GRA-TOPSIS and obstacle tracking model to investigate the performance and obstacle factor of natural forest resource protection project from rangers’ perspective. GRA-TOPSIS is an optimal sequence technique for ideal solution optimization that combines the gray correlation method. The empirical results showed the overall performance of the natural forest resource protection project is good, the relative gray closeness that indicated the process dimension value of the natural forest resource protection project (NFRPP) is 0.663 which higher than the outcome dimension. It reflected the characterization and value level of overall and dimensions performance of NFRPP in Qilian Mountain. The rangers’ support evaluation is the highest, followed by the ecological outcome, sustainability and stability. The key obstacle is the support of local farmers, the social and economic outcome of the project. The natural forest resource protection project has shortcomings in its management system, function setting and support mechanism and urgently improved it from the resource system, resource unit, management system and user. These results are important to promote better implementation of such ecological projects, to enhance the project stability and the regional sustainable development.
机译:森林在土地退化和恢复过程中发挥着重要作用。作为保护自然森林的国家重点生态项目,自然森林资源保护项目在17个省份实施了近20年。作为核心利益攸关方和保护森林资源的主要武力,别人对政策进程的明确,更客观而全面的看法,而不是农民的政策进程,问题和森林生态变化。本研究介绍了公共值理论,建立了一个绩效评估系统,将生态施工的“过程 - 结果”结合起来,并使用GRA-TOPSIS和障碍跟踪模型来研究来自别人的观点的自然森林资源保护项目的性能和障碍因素。 GRA-TOPSIS是一种最佳的序列技术,可实现灰色相关方法的理想解决方案优化。实证结果表明,天然森林资源保护项目的整体性能良好,指出了自然森林资源保护项目(NFRPP)的流程尺寸值的相对灰色近距离是0.663,其高于结果维度。它反映了祁连山NFRPP的整体和尺寸表现的表征和价值水平。 Rangers的支持评估是最高的,其次是生态结果,可持续性和稳定性。关键障碍是当地农民的支持,项目的社会和经济结果。自然森林资源保护项目在其管理系统中具有缺点,功能设置和支持机制,并从资源系统,资源单位,管理系统和用户急切地改进它。这些结果对于促进更好地实施此类生态项目,以提高项目稳定和区域可持续发展的重要性是重要的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号