首页> 美国卫生研究院文献>Acta Orthopaedica >In vitro measurement of temperature changes during implantation of cemented glenoid components
【2h】

In vitro measurement of temperature changes during implantation of cemented glenoid components

机译:骨水泥关节突植入过程中温度的体外测量

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

>Background and purpose It is unclear whether the increase in temperature during cement curing may cause osteonecrosis, leading to loosening of the glenoid component in shoulder arthroplasty. We therefore analyzed the temperature during implantation of cemented glenoid implants.>Methods 8 keeled and 8 pegged glenoids were implanted in standardized fashion in 8 pairs of scapulas. Temperature and pressure sensors were implanted at the bone-cement interface in the glenoid. Real-time measurements were made of temperature and pressure within the glenoid vault.>Results In no case was the temperature reached high enough to endanger the surrounding bone. The mean increase in temperature was 5° (0.5–6.9) in the keeled group and 2.7° (1.7–3.6) in the pegged group. The mean maximum pressure in the keeled group was 50 kPa (20–100) and in the pegged group it was 113 kPa (60–181). Both differences were statistically significant.>Interpretation The temperatures that occur during implantation of cemented components are low and probably not high enough to cause osteonecrosis in the surrounding bone.
机译:>背景和目的目前尚不清楚在水泥固化过程中温度升高是否会引起骨坏死,从而导致肩关节置换术中的关节盂部件松动。因此,我们分析了骨水泥关节盂植入物的植入过程中的温度。>方法以标准方式在8对肩骨中植入8个龙骨和8个钉住的关节盂。温度和压力传感器植入关节盂的骨水泥界面。实时测量关节盂内的温度和压力。>结果在任何情况下,温度都无法达到足以危及周围骨骼的温度。龙骨组的平均温度升高为5°(0.5–6.9),而钉住组的平均温度升高为2.7°(1.7–3.6)。龙骨组的平均最大压力为50 kPa(20–100),而钉住组的平均最大压力为113 kPa(60–181)。两者的差异均具有统计学意义。>解释:粘合组件植入过程中发生的温度很低,可能还不足以引起周围骨骼的骨坏死。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号