首页> 中文期刊> 《人民长江》 >三峡船闸高边坡锚索预应力损失监测成果分析

三峡船闸高边坡锚索预应力损失监测成果分析

         

摘要

In order to understand the long-term performance of the pre-stressed anchorage cables installed in high slope of ship-lock of Three Gorges Project, the statistical analysis on the pre-stress variation process was carried out on the basis of the 15 years'monitoring data from 73 anchorage cables. The magnitude and distribution characteristic of the pre-stress loss at the locking moment and after the locking till December of 2014 are presented. The mode of the sequential curve of pre-stress loss after the locking are divided and the evolution laws under different modes are summarized and compared. The 3-stage pattern is the most representative, namely the abrupt spurt stage, randomly up-down attenuation stage and periodically stable fluctuation stage. The reason and influential factors of pre-stress loss are summarized in terms of different stages. The relationship between the pre-stress loss and the stability of slope is briefly discussed.%为了解三峡船闸高边坡预应力锚索的长期工作性能,根据73台锚索测力计累计达15 a左右的监测资料,对锚索预应力变化过程进行了统计分析,分别给出了锚索在锁定时以及锁定后截至2014年12月的预应力损失率量值及分布特点. 同时,对锚索锁定后预应力损失率时序曲线进行了模式划分,并就不同模式下的发展规律进行了归纳与对比,指出以"急剧损失期、随机摆动衰减期、周期性平稳波动期"的3阶段发展模式最为典型. 在此基础上,针对预应力变化的不同阶段,分析总结了损失原因和影响因素,并就预应力损失和边坡稳定性关系作了简要讨论.

著录项

  • 来源
    《人民长江》 |2015年第24期|82-87|共6页
  • 作者单位

    国家大坝安全工程技术研究中心,湖北 武汉 430010;

    长江勘测规划设计有限责任公司,湖北 武汉 430010;

    国家大坝安全工程技术研究中心,湖北 武汉 430010;

    长江勘测规划设计有限责任公司,湖北 武汉 430010;

    国家大坝安全工程技术研究中心,湖北 武汉 430010;

    长江勘测规划设计有限责任公司,湖北 武汉 430010;

    国家大坝安全工程技术研究中心,湖北 武汉 430010;

    长江勘测规划设计有限责任公司,湖北 武汉 430010;

  • 原文格式 PDF
  • 正文语种 chi
  • 中图分类 水闸;
  • 关键词

    预应力损失; 锚索; 高边坡; 三峡船闸;

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号