In the upgradation and reconstruction of new and old wastewater treatment plants (WWTPs),saving lands would become a main consideration in the process of programming.In Chengdu and its surrounding,ten WWTPs with the size from 10 000 m3/d to 700 000 m3/d were chosen to analysis.Through the investigating of locale and collecting materials,the relationship between the scale of the WWTP,the technological condition and the occupied area was analyzed, and the optimization measures and suggestions for the design were put forward.%在新建以及旧有污水处理厂的提标改造中,节约用地将成为规划设计过程中的主要考虑因素.选取成都市及周边地区的10座污水处理厂,规模从1万~70万 m3/d 不等,通过进行现场调研及资料的收集分析,对污水处理厂规模、工艺情况与占地面积的关系进行分析,并提出设计中的优化措施与建议.
展开▼