Combining with engineering example of a box beam prefabrication yard for Jing-Fu passenger dedicated railway, it is discussed comprehensively that large-scale temporary project design to the precast method and process of the implementation of the process, which provides references for the rapid and economical construction of similar conditions in future.%结合京福客专某制梁场箱梁预制工程实例,对大临工程设计到预制方法及工艺的实施过程进行了综合论述,为今后快速而经济地建设类似条件箱梁预制场提供了参考。
展开▼