Taking the unfavorable geological conditions of area of Wuxi railway Yellow River bridge crossing the beach, the paper compares the two programs, box girder precast and assembly and support cast, in economy, security and construction period, and focuses on support cast construction program.% 以乌锡铁路黄河特大桥穿越滩涂地区不良地质为例,对箱梁预制拼装和支架现浇两种方案在经济、安全、工期等方面进行对比,并侧重介绍了支架现浇施工方案。