建筑密集区桩基施工的最大问题在于施工环境狭小,易对周边桩基造成影响。因此,必须采取特点的控制方法以隔离和消除施工影响。本文首先介绍了建筑密集区的施工环境及其对桩基施工带来的影响,进而分析了针对不同场景的控制方法。%The biggest problem of built-up area pile founda-tion construction is the narrow construction environment and easy to affect the surrounding pile foundation. Therefore, pe-ople must take the special control method to isolate and elim-inate the influence of construction. This article first introduces the construction environment of built-up area and the influence on the pile foundation construction, and analyzes the control methods bases on different scenarios.
展开▼