The original design of high pressure water mist fire extinguishing system applied to Wuxi metro Line 1 is introduced, differences in relevant provisions between GB 50898-2013 " Technical Code for Water M ist Fire Extinguishing System" and the original plan are analyzed. Based on the extension line of Wuxi metro Line 1, with the implementation of the GB 50898-2013 code, problems and possible solutions in the practical application of the code are discussed in terms of construction investment and enforceability.%介绍了高压细水雾系统在无锡地铁1号线中的原设计方案, 分析了原方案与GB 50898—2013《细水雾灭火系统技术规范》中相关条文的差异.以无锡地铁1号线延伸线为例, 在贯彻GB 50898—2013的前提下, 从建设投资、可实施性等方面, 简述其在实际应用中所面临的问题以及可能的解决方案.
展开▼