介绍了国内首组城市轨道交通用三段定心式道岔在研制过程中的转辙分析过程.以三开道岔为例,通过自编程序对道岔转辙过程进行模拟,得到了转辙全过程中道岔各梁段的运动情况,找到了转辙过程中加速度变化的最大位置,为道岔转辙机构的具体设计提供了参考.%This article made a brief introduction to shunting process analysis in developing the 3-girder-switch with fixed rotating center of the Chinas first group for rail transit. Taking a 3 - way switch as an example, we simulated shunting process by the software which was developed by ourselves. We gained the kinematics conditions of all the girders during the shunting process of the switch, and finally found out the place where the maximum of the acceleration changing rate was located. The results can provide a reference for the specific design of the shunting device of the switch.
展开▼