武汉市二郎庙污水处理厂设计规模24×104m3/d,采用改良A/A/O处理工艺.主要介绍了污泥培养驯化方案的制定,过程和经验,可为类似城市污水处理厂的调试和试运行提供借鉴.%The Erlangmiao Sewage Treatment Plant of Wuhan City has a design capacity of 24×104 m3/d adopting the process of improved A/A/O. In this paper, the sludge acclimation was introduced including making plan, acclimation process and experience obtained, which provides references for starting up and operation of similar municipal sewage treatment plants.
展开▼