首页> 中文期刊> 《山西建筑》 >箱梁桥竖向预应力孔道布置及压浆工艺的优化

箱梁桥竖向预应力孔道布置及压浆工艺的优化

         

摘要

The paper introduces the current working procedure of the vertical prestressed duct grouting of box girder webs, researches the prob-lems in the grouting process, including grouting impassability, unfilled grouting, insufficient bonding of the grouting, and bond, five kinds of schemes for improving the design of the channels of vertical prestressed reinforcement and the process of grouting are presented, so as to promote the grouting quality of the vertical prestress.%介绍了箱梁腹板竖向预应力筋孔道压浆的现有作业流程,对压浆过程中存在的压浆不通、压浆不饱满、压浆起不到粘结、握裹作用的问题进行了研究,并提出了五种改进竖向预应力筋孔道布设和压浆工艺的方案,以提高竖向预应力的灌浆质量。

著录项

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号