Combined with the geological conditions of fully mechanized mining face in Daliuta coal mine, this paper analyzed the key factors of influencing operation rate. By taking some measures, the operation rate were ensured, the production were improved and pro- vided scientific basis for high production and high efficiency and safety management.%结合大柳塔煤矿12上311-1综采工作面的实际情况,分析了影响综采工作面开机率的主要因素,提出其相应的解决办法,保证工作面设备开机率,提高了综采工作面单产水平,为实现回采工作面的高产高效,提高安全管理提供了科学依据。
展开▼