The Procedure for Assembling the EAST Tokamak

         

摘要

Due to the complicated constitution and high precision requirements of the EAST superconducting tokamak, a meticulous assembling procedure and measurement scheme must be established. The big size and mass of the EAST machine's components and complicated configuration with tight installation tolerances call for a highly careful assembling procedure. The assembling procedure consists of three main sub-procedures for the assembling of the base, of the tori of the VV, the vacuum vessel TS and the TF, and of the peripheral parts respectively. Before the assembly, a reference framework has been set up by means of an industrial measurement system with reference fiducial targets fixed on the wall of the test hall. In this paper, the assembling procedure is described in detail, the survey control system of the assembly is discussed, and progress in the assembly work is also reported.

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号