首页> 中文期刊> 《核科学与工程》 >HTR-10一回路流量变化试验的模拟

HTR-10一回路流量变化试验的模拟

         

摘要

10 MW高温气冷实验堆(HTR-10)是我国第一座高温气冷堆.一回路流量变化试验是HTR-10的三个动态特性试验之一,该试验不仅证明了反应堆的功率自调节性能,也为系统分析程序的验证提供了实测数据.基于实际的试验工况,利用THERMIX程序对一回路流量变化试验进行了模拟,分析了反应堆主要参数的变化.关于反应堆功率,计算结果与试验结果符合得很好,证明程序能够满意地再现HTR-10在该试验中的动态特性.试验过程中,燃料元件中心最高温度始终低于1230 ℃的温度限值.%The 10 MW high temperature gas-cooled reactor (HTR-10) is the first of its kind in China. The primary mass flow variation test is one of the three dynamic characteristic tests conducted on HTR-10. This test not only verifies the HTR-10 reactor power self-adjustment capability, but also provides measured data for the validation of system analysis codes. Based on actual test conditions, the primary mass flow variation test is simulated using the THERMIX code. Furthermore, main reactor parameters of interest are analyzed. The calculated reactor power agrees well with the test one, demonstrating that the HTR-10 dynamic characteristics can be reproduced satisfactorily by THERMIX. During the test process, the maximum fuel center temperature is always below its limit value of 1 230 ℃.

著录项

  • 来源
    《核科学与工程》 |2017年第2期|210-214|共5页
  • 作者单位

    清华大学核能与新能源技术研究院,先进核能技术协同创新中心, 先进反应堆工程与安全教育部重点实验室,北京100084;

    清华大学核能与新能源技术研究院,先进核能技术协同创新中心, 先进反应堆工程与安全教育部重点实验室,北京100084;

    清华大学核能与新能源技术研究院,先进核能技术协同创新中心, 先进反应堆工程与安全教育部重点实验室,北京100084;

    清华大学核能与新能源技术研究院,先进核能技术协同创新中心, 先进反应堆工程与安全教育部重点实验室,北京100084;

    清华大学核能与新能源技术研究院,先进核能技术协同创新中心, 先进反应堆工程与安全教育部重点实验室,北京100084;

    清华大学核能与新能源技术研究院,先进核能技术协同创新中心, 先进反应堆工程与安全教育部重点实验室,北京100084;

  • 原文格式 PDF
  • 正文语种 chi
  • 中图分类 反应堆热工动态和计算;
  • 关键词

    10MW高温气冷实验堆; 一回路流量变化试验; THERMIX; 程序验证;

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号