首页> 中文期刊> 《核工业西南物理研究院年报:英文版》 >Arc Power Limit and Distribution on the Large Negative Ion Source Based on JT-60 NNBI

Arc Power Limit and Distribution on the Large Negative Ion Source Based on JT-60 NNBI

         

摘要

The target of the large negative ion source based on neutral beam injection (N-NBI) is to produce neutral beam current of 22 A and beam power of 10 MW at 500 keV with duration time of 10 s. Since it was successfully operated in 1996, the 5.3 MW neutral beam power at 380 keV with duration time of 3 s has been achieved. In recent years improving and enhancing the beam power are going on. Several reasons such as plasma non-uniformity, higher beam density at the upper region in the beam profile,

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号