首页> 中文期刊> 《气象与环境研究:英文版》 >Treatment of Wastewater from Pharmaceutical Intermittent Production by Fe/C-Fenton-Hydrolysis Acidification-A/O Process

Treatment of Wastewater from Pharmaceutical Intermittent Production by Fe/C-Fenton-Hydrolysis Acidification-A/O Process

         

摘要

The design and running effect of treatment of wastewater from pharmaceutical intermittent production by iron-carbon(Fe/C)-Fentonhydrolysis acidification-anoxic/aerobic(A/O)process were introduced.The results of continuous operation showed that when the flow rate of the influent wastewater was 300 m3/d,after the influent high-concentration wastewater(CODCrand NH4+-N concentration were 35 000 and 1 000 mg/L,respectively)and medium-concentration wastewater(CODCrand NH4+-N concentration were 1 500 and 100 mg/L,respectively)were treated by the process,CODCrand NH4+-N concentration in the effluent decreased to 360-410 and 20-25 mg/L,respectively,and the quality of the effluent could meet the Grade III standard of Integrated Wastewater Discharge Standard(GB 8978-1996).The combined process was proved to be an effective method to treat wastewater from pharmaceutical intermittent production,and its operation was stable.

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号