首页> 中文期刊> 《东华大学学报:英文版》 >Periodical Inspections and Delay Replacement Model Based on Age Preventive Replacement Policy

Periodical Inspections and Delay Replacement Model Based on Age Preventive Replacement Policy

         

摘要

Periodical inspections and an age-based preventive replacement( APR) model were proposed based on a two-stage failure process for a single component system. Inspection activities were performed at regular intervals. Once the system was identified to be at defective state by inspection,a maintenance decision needed to be made that whether to replace the defective system immediately or wait till the preset APR time. So a threshold was introduced into the model and called as inspection-based preventive replacement( IPR) threshold. If the distance from the defect identification point to the APR time was longer than the threshold, a preventive replacement( PR) action was made; otherwise PRaction was to wait till the APR time. Two models were proposed and compared,and a numerical example was conducted to illustrate the applicability of the model.

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号