首页> 中文期刊> 《煤炭学报:英文版》 >A new method of cut-blasting for vertical shaft excavation and its experimental study

A new method of cut-blasting for vertical shaft excavation and its experimental study

         

摘要

Based on cutting principle and technology development of vertical blasthole cutby stage and deck in vertical shaft excavation, combined with the merits of middle spacecharging and toe space charging, the reinforced cutting effect of central large-diameterblasthole and the method of cutting blast by stage and deck toe space charging for thevertical large-diameter blastholes was put forward and analyzed theoretically.This new cutblasting method is provided with the advantages of high blasthole using ratio, big cavitybulk, low rate of chunk, even lumpiness, and relatively high energy using ratio.The parameterchoices and practical effects of this cutting method were discussed after in situexperiment.It shows that the decked delay time of 75~100 ms is applicable.

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号