首页> 中文期刊> 《煤炭学报(英文版)》 >Position-optimization on retained entry and backfilling wall in gob-side entry retaining techniques

Position-optimization on retained entry and backfilling wall in gob-side entry retaining techniques

         

摘要

This study investigates the stability problem of gob-side entry retaining (GER) and backfilling wall which located under the key block B. Based on the combined research of elastic–plastic mechanics, structure mechanics and modern theory of mining-induced pressure, the caving characteristic and roof structure over the GER were analyzed, and the vertical force and the torque on retained entry roof were also derived as the position for the retained entry varies. On the basis of the specific geology in Huainan mining area, the results indicate that a relatively more stable position for retained entry neighbors the hinge point of block A and B, and it also located at a scope ranging from this point to the one-third length of block B in horizontal direction. As to appropriate position for backfilling wall, this study recommends partial-road-in backfilling method for GER. Field trial conducted at panel face 12418 of Xieqiao Mine demonstrates that the recommended width for original entry is 3.6 m and the preferred width proportion between original retained entry and original entry is 75%or so whereas the avoidable one is 88%or so. These findings provide qualitative references to the mines which share similar geology as what Huainan mining area characterized.

著录项

  • 来源
    《煤炭学报(英文版)》 |2015年第3期|186-195|共10页
  • 作者

  • 作者单位
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号