首页> 中文期刊> 《中南大学学报(英文版)》 >Long-term settlement prediction of high-speed railway bridge pile foundation

Long-term settlement prediction of high-speed railway bridge pile foundation

         

摘要

The process and characteristics of loading on high-speed railway bridge pile foundation were firstly obtained by means of field research and analysis, and the corresponding loading function was presented. One-dimensional consolidation equation of elastic multilayered soils was then established with single drainage or double drainages under multilevel loading. Moreover, the formulas for calculating effective stress and settlement were derived from the Laplace numerical inversion transform. The three-dimensional composite analysis method of bridge pile group was improved, where the actual load conditions of pile foundation could be simulated, and the consolidation characteristics of soil layers beneath pile were also taken into account. Eventually, a corresponding program named LTPGS was developed to improve the calculation efficiency. The comparison between long-term settlement obtained from the proposed method and the in-situ measurements of pile foundation was illustrated, and a close agreement is obtained. The error between computed and measured results is less than 1 mm, and it gradually reduces with time. It is shown that the proposed method can effectively simulate the long-term settlement of pile foundation and program LTPGS can provide a reliable estimation.

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号