首页> 中文期刊> 《全球能源互联网(英文版)》 >Real time thermal field analysis on Wudongde super high arch dam during construction

Real time thermal field analysis on Wudongde super high arch dam during construction

         

摘要

During concrete dam construction, concrete temperature monitoring and control is key to ensuring dam concrete quality and construction safety. In this study, a 2D thermal field restructuring method relating to the Kriging temperature interpolation is proposed. Based on dam site monitoring data of distributed optical fiber, the results indicated that the proposed restructuring method can be applied to effectively and quickly obtain 2D real thermal field. The evolution law of thermal field in early ages and temperature differences of concrete blocks based on the thermal field data are obtained. It also can be concluded that the proposed restructuring method could help obtain accurate and reliable restructuring monitoring data.

著录项

  • 来源
    《全球能源互联网(英文版)》 |2019年第3期|264-269|共6页
  • 作者单位

    Department of Hydraulic Engineering, Tsinghua University, Beijing 100084, P.R. China;

    Department of Hydraulic Engineering, Tsinghua University, Beijing 100084, P.R. China;

    China Three Gorges Corporation, No. 1 Yuyuantan South Road, Haidian District, Beijing 100038, P.R. China;

    Department of Hydraulic Engineering, Tsinghua University, Beijing 100084, P.R. China;

    China Three Gorges Corporation, No. 1 Yuyuantan South Road, Haidian District, Beijing 100038, P.R. China;

  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号