首页> 中文期刊> 《地球空间信息科学学报:英文版》 >PRECISE LEVELING OF THE VERY LONG QINLING MOUNTAIN TUNNEL

PRECISE LEVELING OF THE VERY LONG QINLING MOUNTAIN TUNNEL

         

摘要

The Qinling tunnel with length of 18. 488km is located on the railway line from Xi’ an (Shanxi Province) to Ankan (Sichuan Province) in the middle of Qinling moun- tain. It is the longest double track railway tunnel in China and takes the third place in the world. According to the design, the break-through error in vertical direction caused by the al- timetric control surveying is limited to 18mm for the case of one piercing face. Because the leveling route reaches over 120km in length and must go over two mountains in 2 800m height, the first-order precise leveling and precise gravity measurement should be carried out in the construction stage. In this paper the field leveling approach, the application of new technology,some experience as well as the office calculation with final results analysis are in- troduced. By meticulous planning, organization and observation, the final accuracy of vertical difference between two tunnel end points is only 8mm, and it provides reliable surveying guarantee for this great tunnel engineering. Finally it is pointed out that this vertical differ- ence distinguishes obviously from the primary measurement result as high as 114mm. It means that the primary result is not accurate enough.

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号