首页> 中文期刊> 《电气:英文版》 >A Study on Additional Electric Energy Accommodation of Three Gorges Hydropower Station

A Study on Additional Electric Energy Accommodation of Three Gorges Hydropower Station

         

摘要

Considering the additional electric energy generated after the full operation of the underground hydropower station, the electric energy accommodation of the Three Gorges Project (TGP) is reviewed. It is focused on the additional electricity accommodation, based on the research at the early stage. The electric energy accommodation solutions are recommended as that, based on the cost-benefit analysis of the power distribution area, the additional electric energy of the Three Gorges should be given priority to meet the needs at the supply end of Hubei and Chongqing. The results of this research has a reference value on the implementation of the Three Gorges electric power accommodation, after the further optimization of the transmission curves in both wet and dry seasons.

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号