首页> 中文期刊>流体力学与材料加工(英文) >CFD-Based Optimization of Hot Primary-Air Pipe Networks in Power Plant Milling Systems

CFD-Based Optimization of Hot Primary-Air Pipe Networks in Power Plant Milling Systems

     

摘要

A hot primary-air pipe system is the bridge connecting an air-preheater with a coal mill in power generation stations.The effective geometrical configuration of the pipe network greatly affects the air flow distribution and consequently influences the safe and economic operation of milling systems in power stations.In order to improve the properties of the air flow,in the present work the SIMPLEC method is used to simulate numerically the flow field for the original layout of the system.As a result,the internal mechanisms influencing the uneven pressure drop in each branch are explored and three optimization schemes are proposed accordingly.The numerical results indicate that,for the original layout,the local pressure drop of the tee section accounts for approximately 74%of the total drop of the system,with other pressure drops depending on the specific branch considered.It is shown that after optimization,a roughly balanced flow resistance and flow rate can be obtained.Compared with the original layout,the pressure drop relating to different branches is significantly reduced.

著录项

相似文献

  • 中文文献
  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号